The Hangar Models Company
Free Shipping with Purchases of $100Join Our Newsletter
Home Page Best Sellers Limited Edition Specials Wish List My Account Contact Us View Cart Checkout
 
 
Custom Models
  Custom Aircraft Model
   
Desktop Models
  Commercial Airlines
Executive Aircraft
General Aviation
Modern Military
WWI - WWII
Helicopters
Spacecraft
Plaques
Tanks & Armored Vehicles
Sailboats
Ships
Naval Series
   
Accessories
  Aircraft Wall Mounts
Display Cases
 
Featured Products
New Arrivals
Specials
 
Share/Save/Bookmark
 
PayPal
 

E-3A Sentry AWACS

 
Click Image to Enlarge
MSRP:
$199.95
Price:
Was: $199.95
Now: $179.95
Your Savings:
$20.00 (10%)
SKU:
CE3AT
Qty:
 
 
 
Facebook Twitter
 
 
 
Eligible for FREE Shipping(Eligible for FREE Shipping)
 

The Boeing E-3 sentry is a military airborne warning and control system (AWACS) aircraft that provides all-weather surveillance, command, control and communications to the United States, United Kingdom, France, NATO and other air defense forces. The E-3 offers superior surveillance capabilities. The E-3 Sentry is a modified Boeing 707-320B Advanced Commercial Airframe. It is a militarized version of the Boeing 707-320B commercial jetliner airframe.

The USAF E-3 fleet completed its largest upgrade which is the Block 30/35 Modification in 2001. The four enhancements were the Electronic Support Measures (ESM) for passive detection, Joint Tactical Information Distribution System (JTIDS) to provide secure, anti-jam communication, memory capability enhancement in the computer and Global Positoning System (GPS).

E-3 Sentry aircraft were among the first to deploy during Operation Shield where they immediately established an around-the-clock radar screen to defend against Iraqi forces. In its strategic defense role, the E-3 provides the means to detect, identify, track and intercept airborne threats.

The E-10 MC2A, based upon the Boeing 767-400ER airframe, was intended to replace the United States operated E-3 (along with the RC-135 and the E-8 Oint STARS), but budget cutbacks have clouded its future.

Production ended in 1992 after 68 had been built.